energyGermany
Power Grid Inspection
Challenge
Manual tower inspections required climbers, were expensive, and could not achieve desired inspection frequency.
Solution
Implemented automated inspection routes using SD-350 UAVs with PL-100 EO/IR payloads.
Results
8x
60%
45%
“Predictive maintenance has transformed our operations.”